Overview

AIS and GIS substations: what we build

An air-insulated substation (AIS) uses open-air spacing between conductors for insulation; it needs more land but is simpler and cheaper to build and maintain. A gas-insulated substation (GIS) encloses switchgear in metal compartments filled with SF6 gas, taking a fraction of the space, which suits cities, mountains and industrial plants.

Nuclear Edge has erected, tested and commissioned substations from 66 kV to 765 kV, including the 765/400 kV Khetri substation and 765 kV Bhadla-II works in Rajasthan for Power Grid, 400/220 kV GIS substations at Gumma and Wangtoo in Himachal Pradesh for HPPCL, 400/220 kV GIS at Amargarh in Jammu & Kashmir and Sohna Road in Gurugram for Sterlite, a 220/132 kV GIS at BPCL's Kochi refinery, and 66/11 kV GIS substations at Narela and Rohini for Tata Power-DDL.

What is included

Substations (AIS & GIS): what we deliver

Structure and equipment erection

Gantries, transformers, breakers, isolators, CTs, PTs and bus work.

GIS installation

Bay assembly, gas handling and SF6 testing to manufacturer procedures.

Control and protection

Panels, relays, SCADA interfaces and cabling.

Earthing and lightning protection

Earth mats, risers and shielding to design.

Testing

Pre-commissioning tests on every item of equipment and every protection scheme.

Commissioning

Energisation with the utility and handover with test records.

Buyer's guide

AIS or GIS: how the choice is made

Land, environment and lifecycle cost decide. GIS is chosen where land is scarce or costly (cities, hill sites, inside plants), where pollution or salt would affect open-air insulation, or where the site sits at altitude. AIS is chosen where land is available and lower capital cost matters. Read the full comparison in AIS vs GIS substations and the testing sequence in substation testing and commissioning.

How we deliver

From survey to support, one team

  1. MobiliseSite survey, method statements, safety plan and permits.
  2. ErectStructures, equipment, cabling and earthing to approved drawings.
  3. TestPre-commissioning tests on every item and protection scheme.
  4. CommissionEnergise with the utility, then hand over with records.

Questions

Substations (AIS & GIS): frequently asked questions

What is the difference between AIS and GIS substations?

An AIS uses air as insulation between open conductors and needs more land; a GIS encloses switchgear in SF6 gas-filled metal compartments and needs far less space. GIS costs more to build but suits cities, mountains and plants.

What voltage levels does Nuclear Edge work at?

Substation erection, testing and commissioning from 66 kV to 765 kV, and HVDC works including the 800 kV WR–NR HVDC project at Kurukshetra.

Which customers has Nuclear Edge built substations for?

Power Grid Corporation, HPPCL, HPTTCL, Sterlite, TPDDL, DTL, DMRC, BPCL, BORL, CSPTCL, GPPTCL, JUSNL, Reliance, Honda Cars and others, listed in the project register.

Does Nuclear Edge work on substations in mountain areas?

Yes, including 400/220 kV GIS substations at Gumma and Wangtoo and 220/66 kV GIS at Hilling in Himachal Pradesh, and 400/220 kV GIS at Amargarh in Jammu & Kashmir.

Contact

Talk to our experts

Tell us about your requirement, tender or RFP. The right practice lead will reply within one working day.