Overview
What does a solar EPC contractor do?
In solar, EPC stands for engineering, procurement and construction. On a utility-scale plant, construction divides into DC works (module mounting structures, modules, string cabling and combiner boxes) and AC works (inverters, transformers, switchgear and the connection to the grid), plus earthing and lightning protection across the site.
Nuclear Edge has completed works across all nine blocks of NTPC's 150 MW solar plant at Bikaner, a 350 MW solar project in Madhya Pradesh, grounding and lightning protection for a 125 MW CSP plant and 125 MW of erection for Reliance Solar at Pokaran, 40 MW for Azure Power at Bikaner, 50 MW AC erection at Bandarwada for ReNew, and is running a 35.2 MW project for O2 Power in Karnataka.
What is included
Solar EPC: what we deliver
DC erection
Mounting structures, modules, string cabling and combiner boxes.
AC erection
Inverters, transformers, HT panels and cabling.
Grounding and lightning protection
Earthing networks and lightning protection across the plant.
Plant substations
132 kV and other pooling and plant substations.
Testing
String, insulation and inverter tests before energisation.
Commissioning support
Support through grid synchronisation and handover.
Buyer's guide
The stages of a solar EPC project
Land and approvals, design and procurement, civil works, DC erection, AC erection, testing, grid connection and commercial operation. The grid connection, through a plant substation and transmission line, is often the longest lead item. Read solar EPC project stages, from land to COD and grid readiness for India's solar build-out.
How we deliver
From survey to support, one team
- MobiliseSite setup, safety plan and material logistics.
- DC worksStructures, modules and string cabling.
- AC worksInverters, transformers and grid connection.
- Test and commissionTests, energisation and handover.
Questions
Solar EPC: frequently asked questions
What does EPC mean in solar?
EPC stands for engineering, procurement and construction: one contractor designs the plant, buys the equipment and builds it. Specialist contractors also take erection packages such as DC or AC works.
What solar projects has Nuclear Edge worked on?
NTPC's 150 MW plant at Bikaner (Blocks 1–9), a 350 MW project in Madhya Pradesh, Reliance Solar's 125 MW CSP and PV works at Pokaran, Azure Power's 40 MW at Bikaner, ReNew's 50 MW AC erection at Bandarwada and O2 Power's 35.2 MW in Karnataka.
What is the difference between AC and DC works in a solar plant?
DC works cover everything from modules to the inverter input: structures, modules and string cables. AC works cover the inverter output to the grid: transformers, switchgear and HT cables.
Why is earthing important in solar plants?
Large plants cover big areas exposed to lightning and faults. A well-designed earthing and lightning protection system protects equipment and people and is checked before commissioning.
Contact
Talk to our experts
Tell us about your requirement, tender or RFP. The right practice lead will reply within one working day.