Overview

What is HVDC transmission?

High-voltage direct current (HVDC) transmission carries bulk power over long distances with lower losses than alternating current, and links grids that are not synchronised. At each end, a converter station changes AC to DC and back again. India uses HVDC to move power between regions, for example from generation in the west to demand in the north.

Nuclear Edge has completed works on the 800 kV Western Region–Northern Region HVDC project at Kurukshetra, Haryana, and the 400 kV AIS substation at HVDC Champa, Chhattisgarh, both for Power Grid Corporation, along with 765 kV substation works at Khetri, Bhadla-II and Banakatha.

What is included

HVDC & transmission: what we deliver

Converter-station works

Erection of equipment in HVDC converter-station yards and halls.

AC switchyards

AC-side switchyards that connect converter stations to the grid.

765 kV and 400 kV substations

Extra-high-voltage substation erection and commissioning.

Earthing and shielding

Earth mats and lightning protection for large yards.

Testing and commissioning

Pre-commissioning tests and support during energisation.

Documentation

As-built records and test reports for the owner.

How we deliver

From survey to support, one team

  1. MobiliseSite survey, method statements, safety plan and permits.
  2. ErectStructures, equipment, cabling and earthing to approved drawings.
  3. TestPre-commissioning tests on every item and protection scheme.
  4. CommissionEnergise with the utility, then hand over with records.

Questions

HVDC & transmission: frequently asked questions

What is the WR–NR HVDC project?

It is an 800 kV HVDC link between India's Western and Northern regional grids, with a terminal at Kurukshetra, Haryana. Nuclear Edge completed works on the project for Power Grid Corporation.

Why use HVDC instead of AC?

HVDC loses less power over long distances, needs fewer conductors for the same power, and can connect grids that are not synchronised. It is used for bulk inter-regional power transfer.

What transmission projects has Nuclear Edge completed?

Works on the 800 kV WR–NR HVDC project at Kurukshetra, the 400 kV HVDC Champa substation, the 765/400 kV Khetri substation and 765 kV Bhadla-II, among others in the project register.

Contact

Talk to our experts

Tell us about your requirement, tender or RFP. The right practice lead will reply within one working day.