Overview

What does datacenter modernisation involve?

Datacenter modernisation replaces or upgrades the servers, storage, networking and virtualisation in an on-premise datacenter so that it runs current workloads faster, more reliably and at lower cost per workload. It usually includes moving applications from old hardware to new without stopping the services that depend on them.

Nuclear Edge delivered datacenter modernisation for DRDO in a Joint Business Relationship with PwC, covering HPE infrastructure and application workload balancing, and storage SITC at the Shastri Park datacenter site for the metro network under a MeitY and DMRC engagement.

What is included

Datacenter modernisation & storage: what we deliver

Assessment

An inventory of servers, storage, applications and their dependencies, with capacity and performance trends.

Storage SITC

Supply, installation, testing and commissioning of SAN, NAS and backup storage.

Compute and virtualisation

Server refresh and consolidation onto virtualised or hyperconverged platforms.

Workload balancing

Applications placed and tuned so no system is starved while another sits idle.

Migration

Planned cut-overs with rollback steps, done in agreed maintenance windows.

Documentation and handover

As-built diagrams, configurations and runbooks your team can operate from.

Buyer's guide

Modernise in place, move to cloud or both?

Not every workload belongs in a public cloud. Systems with data-residency rules, steady heavy loads or tight links to on-site equipment often cost less and perform better on modern on-premise infrastructure. Others benefit from cloud elasticity. Most organisations end up with a hybrid estate, and modernisation is the moment to decide workload by workload.

A sound modernisation plan answers

  • Which applications depend on which servers, databases and storage.
  • What each workload needs in capacity and performance for the next five years.
  • Where each workload should run and why.
  • How each migration will be tested and, if needed, rolled back.

See also modernising datacenters without stopping the business and choosing between SAN, NAS and hyperconverged storage.

How we deliver

From survey to support, one team

  1. DiscoverMap applications, dependencies and capacity.
  2. DesignChoose platforms and the target layout; plan migrations.
  3. Build and migrateInstall, test and move workloads in planned windows.
  4. OperateMonitor, tune and support, or hand over with runbooks.

Questions

Datacenter modernisation & storage: frequently asked questions

What is SITC in a datacenter project?

SITC stands for supply, installation, testing and commissioning. A storage SITC contract makes one partner responsible for delivering the equipment, installing it, testing it against the specification and bringing it into service.

Has Nuclear Edge modernised government datacenters?

Yes. Nuclear Edge delivered datacenter modernisation for DRDO with PwC under a Joint Business Relationship, and storage SITC at the Shastri Park datacenter site under a MeitY and DMRC engagement.

Can a datacenter be modernised without downtime?

Most of it, yes. Workloads are migrated in planned maintenance windows with tested rollback steps, and redundant systems keep critical services running during the change.

Should we move to the cloud instead of modernising?

It depends on the workload. Data-residency rules, steady heavy usage and links to on-site systems often favour modern on-premise infrastructure; variable workloads often favour cloud. A hybrid approach is common.